A proud moment for MEIL Group. Another milestone at the Zojila Road Tunnel Project. We received a Safety Appreciation Certificate for achieving an incredible Ten Million Safe Man-Hours without a single Lost Time Injury (LTI). Building in some of the toughest conditions requires true dedication, and this award proves that we never compromise on safety.

High in the Himalayas, the Zojila Tunnel project is taking shape, with access roads, snow galleries, cut and cover sections, and bridges already completed, while work on the main 13.153 kilometre tunnel. The Zojila Tunnel, at an elevation of over 11,575 feet, is set to become the world’s longest bi directional road tunnel at high altitude, transforming a seasonal pass into all weather connectivity.